Eskom Simmepan

Client: Eskom
• The project entails major upgrading and new installation to the building; the works comprise of the following:
• Removal of existing HVAC system and installation of new VRV Heat Recovery System.
• Reconfiguration and coordination of existing light fittings in line with the new HVAC installation.
• Installation of 400V/230V LV Distribution Boards; this to include small power and lighting installation.
• Upgrade to the fire and smoke detection systems to the building.
• Construction of reinforced concrete raft foundations
• Commissioning and testing of all equipment
• Installation of a manual service hoist with a maximum 500kg capacity.
• Fully coordination of services within the building to suit reconfigured layouts and to align with new HVAC system installation.